Millbury Fire Headquarters

Highlights

– Corner Site Near Downtown
– Drive-through Apparatus
– Gateway Building
– Ledge Removal
– Radiant Heating / Ice Melt

About

Location: Millbury, MA
Size: 22,500 sq. ft.
Status: Completed in 2024

New two-and-a-half-story fire station consisting of 22,500 sq. ft. and featuring four apparatus bays, dedicated support spaces, administrative offices, and living quarters for firefighters. The structure was constructed primarily of masonry veneer with a steel frame to ensure durability and long-term performance. The project scope included the complete removal of the existing building currently on the site.

Photography: Bruce T. Martin

Scope

– Schematic Design
– Design Development
– Construction Documents
– Construction Administration

 
 
Back